  • FM3.05 Health and Welfare Building First Floor- Asbestos Abatement

    Total Actual Cost: $340,040
    Project Number: CFMBHW1DA
    Funding Sources: 2004 General Obligation Bonds
    Completion Date: September, 2010
    Managing Dept.: Facilities Management
    Project Map: GIS Map
     
    Asbestos abatement on the first floor of the Administration West (formerly Health & Welfare) Building was completed prior to renovating the first and second floor to accommodate the Superior Court Pre-Trial services and Adult Probation Divisions.

    To maintain safe access to the building during demolition, abatement and renovation, an access tunnel was constructed from the existing south doors to the elevators and interior exit stairwell. The tunnel was constructed by BC Construction.

    The demolition and abatement of the first floor was performed by Environmental Strategies, Inc (ESI), and conducted using all OSHA & NESHAP requirements. The Work included the removal of asbestos containing sprayed-on fireproofing on structural members and Thermal System Insulation (TSI) in the mechanical rooms of the first floor. Additionally, this work included removal of cement asbestos window wall panels, floor tile and adhesive, the cleaning of over-spray on conduit, wiring, duct work, equipment, as well as other hard surfaces within the abatement area. The fixed ceilings, suspended acoustical tile ceilings, lighting, duct work, piping and conduit were also removed.

    The first floor now stands ready for the Superior Court tenant improvement project.

    Health and Welfare Building First Floor
    Follow UsShare or bookmark this page

    Pima County Bonds

    (520) 724-8450


    Department Home
    Bond News
    Department Directory
    Feedback
    Boards, Commissions and Committees