  • SS6.02 Sunrise Lift Station

    Total Project Cost: $142,100
    Project Number:  CWW3SPS01
    Funding Sources: 2004 Sewer Revenue Bonds
    Completion Date: June 2009
    Managing Dept.: Regional Wastewater Reclamation
    Project Map: GIS Map

    The Sunrise Lift Station was an old brick manhole experiencing leakage. Maintenance workers could not safely enter the wetwell for pump maintenance. This project installed a new fiberglass 4-foot diameter manhole inside of the existing 6-foot diameter brick manhole. The new manhole can be safely entered, but also features a guide rail system so that pumps can be removed for maintenance without workers entering the manhole. The existing pumps were reinstalled in the new manhole. The project included the addition of lights for nighttime inspection and upgraded the electrical and SCADA capabilities to ensure up-to-date conveyance system SCADA standards. The access driveway and drainage were also improved and a new generator pad installed.
    Follow UsShare or bookmark this page

    Pima County Bonds

    (520) 724-8450


    Department Home
    Bond News
    Department Directory
    Feedback
    Boards, Commissions and Committees